Thirty water points have now been completed since Enable Ethiopia was founded in 2006. The table below provide more detail on the water point locations, type and the number of beneficiaries for each of the sites.

watertable1

Note:

HDW: Hand Dug Well

SPD: Spring box cap and reservoir Water point with 2 faucets